top of page

Updating outdated Rehabilitation Plan

Redesign of an existing rehabilitation plan to align with the mine schedule/plan.


Used in mine rehabilitation and closure costings


The scope of work involved conceptual and detailed landform design, soils investigation and classification, land capability assessment, material balance and vegetation surveying.



Inquiries at info@beal.co.za

Commentaires


© 2019 by Beal Consulting Engineers & Project Management

bottom of page